# Texas Electrical Contractor Owner Cash Flow and Job Record Review

# Texas Electrical Contractor Owner Cash Flow and Job Record Review

Short answer: an estimate, approved work, an invoice, recorded income, and cash in the bank are different events\. Keep each event on its own dated line\. Then review job results and future cash timing as two different views, with the underlying invoice, bill, receipt, deposit, and approval records attached\.

## 1\. Start with records that can support each entry

The IRS says a business may choose a recordkeeping system suited to the business if it clearly shows income and expenses\. It also says the system should summarize business transactions and that supporting documents can include sales slips, paid bills, invoices, receipts, deposit slips, and canceled checks\. The live IRS guidance controls federal recordkeeping requirements\.

Use a job identifier to connect the operational file to the accounting record\. Do not treat a draft estimate or an invoice as proof of cash received\. Do not treat a bank deposit as proof that the job was profitable without matching it to approved scope and recorded costs\.

Event

Date field

Evidence link

Job review use

Cash review use

Estimate and approved scope

Prepared and accepted dates

Accepted scope and assumptions

Starting comparison, not final result

No receipt recorded

Approved change

Requested, approved, and completed dates

Written change approval

Updates allowed revenue and expected cost

No receipt until paid

Customer invoice

Issued and due dates

Invoice and approval reference

Tracks billed work

Expected receipt only

Customer payment

Received and deposited dates

Deposit or payment record

Clears the matching receivable

Becomes an observed receipt

Supplier, payroll, or other job obligation

Incurred, due, and paid dates

Bill, time record, receipt, or payment proof

Tracks supported job cost

Shows timing of the obligation and payment

## 2\. Review the job result without calling it cash

Create a job summary from approved scope, approved changes, recorded billings, and supported direct costs\. Keep the business’s accounting policy outside this worksheet until the CPA has reviewed it\. The purpose of this view is to show which records explain the job result and which items remain missing\.

1. List approved scope and changes with their evidence\.
2. List recorded billings and any unbilled approved work as separate rows\.
3. List supported material, labor, subcontract, permit, equipment, and other direct job costs in the categories approved by the business’s reviewer\.
4. Compare the recorded result with the original estimate and explain each material variance\.
5. Mark disputed, missing, or unapproved items pending instead of forcing them into the result\.

## 3\. Build a dated cash timing view

A cash timing view starts with observed available cash, expected receipts by expected receipt date, and obligations by due date\. It is a planning view, not a promise that a customer will pay on time and not a choice of accounting or tax method\.

Period

Observed opening cash

Expected receipts

Obligations due

Uncertainty and owner

Current review date

Bank record and reconciliation date

Do not enter an invoice as cash received

Bills and payroll due before the next update

Name every unresolved timing question

Next review period

Prior ending planning balance, subject to reconciliation

Invoice, expected date, confidence note, follow\-up owner

Vendor, payroll, tax, insurance, and other dated obligations

Record what would change the plan

### Questions for the bookkeeper or CPA

- Which records and account categories should support each entry?
- How should deposits, retainage, disputed invoices, and unbilled approved changes be shown in the business’s records?
- Which job\-cost categories should be used consistently?
- How often should accounts receivable, accounts payable, bank records, and the cash timing view be reconciled?
- Which report is the official accounting record, and which worksheet is only an internal planning aid?

Boundary: this article is an educational record\-review workflow\. It does not choose an accounting method, prepare a return, make a borrowing decision, or replace a bookkeeper or CPA\. Use fictional or properly protected records when practicing\.

Place this owner skill on the public [Texas career map](https://www.tsaielectro.com/career-map/) \. For structured member exercises, see [membership options](https://www.tsaielectro.com/membership/) \.
