No pay difference shown for this route: no single published pay schedule names every stop, and the occupation medians are not like for like on every move.
Gates on this route
1Move 1, to Facilities Engineer (Electrical): bachelor's degree (O*NET: most in Facilities Engineer (Electrical) hold one), license depends on the work (Texas PE license (TBPELS) is required for the practice of engineering as defined in Occ. Code 1001.003; whether this job needs it depends on the work), experience: over 4 years, up to and including 6 years (O*NET, most common).
2Move 2, to Senior Facilities Engineer (Electrical): no degree, license or hours gate found (O*NET 31.0 and the licensing agencies checked for this job).
3Move 3, to Principal Facilities Engineer (Electrical): no degree, license or hours gate found (O*NET 31.0 and the licensing agencies checked for this job).
O*NET lists Electrical Engineers as a related occupation (Primary-Long); skills and knowledge profile similarity r = 0.90.
Gates: bachelor's degree (O*NET: most in Facilities Engineer (Electrical) hold one), license depends on the work (Texas PE license (TBPELS) is required for the practice of engineering as defined in Occ. Code 1001.003; whether this job needs it depends on the work), experience: over 4 years, up to and including 6 years (O*NET, most common).
Skills to build: Science, Active Learning, Mathematics
Move 2 I1step up on Semiconductor fab facilities (electrical)
Next rung on 'Semiconductor fab facilities (electrical)' (Skilled to Senior).
Gates checked: no degree, license or hours gate found (O*NET 31.0 and the licensing agencies checked for this job).
Move 3 I1step up on Semiconductor fab facilities (electrical)
Senior Facilities Engineer (Electrical) →to Principal Facilities Engineer (Electrical)
Next rung on 'Semiconductor fab facilities (electrical)' (Senior to Senior).
Gates checked: no degree, license or hours gate found (O*NET 31.0 and the licensing agencies checked for this job).
Side by side
All Electrical Engineers: Texas median $129,450, $48,830 more a year than all Electrical and Electronics Drafters ($80,620), every experience level.
Principal Facilities Engineer (Electrical): 58% work more than 40 hours a week, about 1.6 times the share for Electrical Drafter (36%).
Occupation-wide pay all experience levels, not this level's pay; Texas median, base pay, $0 to $300k
A
$80,620
$0$100k$200k$300k
B
$129,450
$0$100k$200k$300k
$80,620+$48,830$129,450
Gates on the route: Facilities Engineer (Electrical): bachelor's degree (O*NET: most in Facilities Engineer (Electrical) hold one), license depends on the work (Texas PE license (TBPELS) is required for the practice of engineering as defined in Occ. Code 1001.003; whether this job needs it depends on the work), experience: over 4 years, up to and including 6 years (O*NET, most common).
Outlook 2024 to 2034 whole occupation
A+0.9% Texas, 220 openings a year
B+14.0% Texas, 1,060 openings a year
Over 40 h a week
A
40 h 52%>40 h 36%
B
40 h 42%>40 h 58%
36%+22 pts58%
Physical load our index from O*NET, 1 to 5; A B; largest differences first
1.5 / 5+0.42.0 / 5
Cramped space+0.75Cramped space: A 1.26, B 2.01
Very hot or cold+0.63Very hot or cold: A 1.76, B 2.39
Climbing ladders+0.63Climbing ladders: A 1.09, B 1.72
High places+0.60High places: A 1.21, B 1.81
Hazardous equipment+0.56Hazardous equipment: A 1.62, B 2.18
Degree
A Most people in this job do not hold a bachelor's degree (O*NET: 43% do).
B Most people in this job hold a bachelor's degree or higher (O*NET: 89%).
License
A No license for this job title at the 8 Texas and federal licensing agencies read on 2026-10-03 (TDLR, TSBPE, TCEQ, TCFP, TEA, TBPELS, NRC and EPA).
B Texas PE license (TBPELS) is required for the practice of engineering as defined in Occ. Code 1001.003; whether this job needs it depends on the work.
Experience
A Most common related work experience: over 6 months, up to and including 1 year (O*NET: 30%).
B Most common related work experience: over 4 years, up to and including 6 years (O*NET: 30%).
Skills O*NET importance, 1 to 5
You likely have: 6
Coordination
Judgment and Decision Making
Instructing
Quality Control Analysis
Social Perceptiveness
Time Management
To build: 6
Science +1.12
Active Learning +0.63
Mathematics +0.63
Speaking +0.63
Reading Comprehension +0.62
Writing +0.62
Make this your goal
Save Electrical Drafter to Principal Facilities Engineer (Electrical) as your goal. Each step then shows the hours you have logged toward it, your exam practice and your license, with the one thing to do next and the 6 skills to build as a checklist. Free with an account.
Share your route
One number, the route and its gate go on the card; nothing about you. Your device's dark mode picks the dark card.
Feed, 1080 × 1350 · light and darkLink preview, 1200 × 630 · light and dark
Save routes and track your hours with ET Member. Saved routes, your gap plan and alerts when pay, license rules or exams change.
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.