Not selected · English · Dual units
My account Start free test

Compare A Solar Energy Installation Manager ↔ B Electrical General Foreman

Your route

2 moves

No pay difference shown for this route: no single published pay schedule names every stop, and the occupation medians are not like for like on every move.

Gates on this route

  • Move 1, to Electrical Foreman: experience: over 10 years (O*NET, most common).
  • Move 2, to Electrical General Foreman: no degree, license or hours gate found (O*NET 31.0 and the licensing agencies checked for this job).
  1. Move 1 Transfer move to the side

    Solar Energy Installation Manager to Electrical Foreman

    • O*NET lists First-Line Supervisors of Construction Trades and Extraction Workers as a related occupation (Primary-Short); skills and knowledge profile similarity r = 0.87.
    • Gates: experience: over 10 years (O*NET, most common).
  2. Move 2 Transfer move to the side

    Electrical Foreman to Electrical General Foreman

    • Same O*NET occupation (47-1011.00 First-Line Supervisors of Construction Trades and Extraction Workers): O*NET lists both job titles under it; same tasks and skills data.
    • Gates checked: no degree, license or hours gate found (O*NET 31.0 and the licensing agencies checked for this job).

Side by side

More than 40 hours a week: Electrical General Foreman 63%, Solar Energy Installation Manager 62%.

Occupation-wide pay all experience levels, not this level's pay; Texas median, base pay, $0 to $300k

A
B
$74,520no difference shown$74,520

Both jobs fall under one OEWS occupation (Solar Energy Installation Managers); OEWS does not split pay by level, so a difference would read $0.

Outlook 2024 to 2034 whole occupation

A +10.0% Texas, 8,780 openings a year

B +10.0% Texas, 8,780 openings a year

Over 40 h a week

A
B
62%+1 pts63%

Physical load our index from O*NET, 1 to 5; A B; largest differences first

3.3 / 5-0.33.0 / 5

  • High places-1.07High places: A 3.91, B 2.84
  • Hazardous equipment+0.82Hazardous equipment: A 3.36, B 4.18
  • Hazardous conditions-0.78Hazardous conditions: A 3.73, B 2.95
  • Climbing ladders-0.77Climbing ladders: A 2.79, B 2.02
  • Keeping balance-0.52Keeping balance: A 2.33, B 1.81

Degree

A Most people in this job do not hold a bachelor's degree (O*NET: 6% do).

B Most people in this job do not hold a bachelor's degree (O*NET: 10% do).

License

A No license for this solar supervision title at TDLR; the installing company needs a TDLR Electrical Contractor license, and anyone doing the PV wiring needs a TDLR electrician license.

B Usually holds the TDLR Journeyman Electrician license from the previous rung; TDLR has no separate foreman license (license list checked).

Experience

A Most common related work experience: over 6 months, up to and including 1 year (O*NET: 26%).

B Most common related work experience: over 10 years (O*NET: 30%).

Skills O*NET importance, 1 to 5

You likely have: 6

  • Coordination
  • Active Listening
  • Speaking
  • Critical Thinking
  • Management of Personnel Resources
  • Monitoring

To build: 0

    Make this your goal

    Save Solar Energy Installation Manager to Electrical General Foreman as your goal. Each step then shows the hours you have logged toward it, your exam practice and your license, with the one thing to do next. Free with an account.

    Share your route

    One number, the route and its gate go on the card; nothing about you. Your device's dark mode picks the dark card.

    My route: Solar Energy Installation Manager to Electrical General Foreman, 2 moves (on the Electrical Career Map). Gate: experience: over 10 years.
    Feed, 1080 × 1350 · light and dark
    My route: Solar Energy Installation Manager to Electrical General Foreman, 2 moves (on the Electrical Career Map). Gate: experience: over 10 years.
    Link preview, 1200 × 630 · light and dark

    ★ Resources
    Scroll to Top
    Not a licensed Professional Engineer in Texas or any U.S. state. Does not offer engineering services. Exam-prep education only.