Your next steps
Most cement masons and concrete finishers start with a high school diploma, then learn through an apprenticeship or on the job, often starting as laborers or helpers. Pick where you are starting and you get your next 4 steps. Below, the whole route is laid out as 32 steps, from pour day basics to crew and credentials.
Keep your place on the cement mason tree
A free account opens every lesson on the tree and marks the steps you finish, so you always know your next one. No card required.
Track the jobs, then bid your own
Application Tracker keeps every school, apprenticeship and job application, follow-up and offer in one private place. Job Desk writes estimates and invoices when you take your own concrete work. Both come with Tsai Electro Pro, US$99 a year.
The path in four stages
The cement mason career tree splits the route into 32 steps across four stages. Start where the tool above put you; every step opens its own lesson.
Stage 1: Pour day basics (8 steps)
Delivery tickets, slump, test specimens, skin protection, forms, rebar and the pump hose.
- Read a concrete delivery ticket before placement
- Coordinate a slump test without altering the sample
- Protect field-made concrete test specimens
- Keep wet concrete off skin and out of boots
- Check forms and subgrade before the truck arrives
- Work safely around a concrete pump hose discharge zone
- Protect work around protruding reinforcing steel
- Respect the authorization boundary for formwork removal
Stage 2: Place and finish (9 steps)
Placing, striking off, bull-floating, edging, joints, floating, troweling and broom finish.
- Place concrete close to final position
- Strike off flatwork to the grade controls
- Bull-float the slab without trapping bleed water
- Form a durable slab edge with an edger
- Tool contraction joints at the planned locations
- Float the surface when the concrete can support the pass
- Build a hard-troweled finish in successive passes
- Pull a consistent broom texture across exterior flatwork
- Prepare and control a walk-behind power trowel
Stage 3: Weather and repair (9 steps)
Curing, hot and cold weather, shrinkage, ramps, vertical repair, color, stamping and patching.
- Start curing as soon as the finish allows
- Sequence a hot-weather placement to limit rapid surface drying
- Protect fresh concrete during cold weather
- Respond to plastic-shrinkage warning signs before finishing
- Finish a ramp while holding slope and cross-slope controls
- Place and finish a formed vertical repair
- Keep integral-color concrete visually consistent
- Stamp a decorative pattern without double impressions
- Patch small surface defects to the approved repair detail
Stage 4: Crew and credentials (6 steps)
Silica, elevations, crew zones, testing credentials and the apprenticeship record.
- Use the assigned silica control while cutting concrete
- Check slab elevation and surface variation during finishing
- Plan crew zones for a continuous slab placement
- Choose the ACI flatwork credential that matches your experience
- Coordinate with ACI field testing personnel
- Build a concrete-finishing apprenticeship evidence record
Cement mason pay and jobs
| Measure | Value |
|---|---|
| Median pay, May 2025 | $58,270 a year ($28.02 an hour) |
| Lowest 10% | Under $39,670 |
| Highest 10% | Over $91,350 |
| Median for cement masons and concrete finishers | $57,020 |
| Median at poured concrete foundation and structure contractors | $55,690 |
| Median in heavy and civil engineering construction | $55,560 |
| Jobs in 2025 | 277,700 |
| Job growth, 2025–35 | 1%, about 3,300 jobs (slower than average) |
| Openings each year, on average | About 18,400 |
Figures are for all masonry workers in the United States, from the BLS Occupational Outlook Handbook. BLS projects cement mason and concrete finisher jobs to grow 2%, from 204,800 to 208,100, from 2025 to 2035.
Apprenticeship and credentials: what is true everywhere
Unions and contractor associations sponsor apprenticeships, and apprentices learn blueprint reading, math, building code requirements, and safety and first aid. Many finishers start as laborers or helpers. On the tree, plan a field-testing credential and keep your apprenticeship record so the hours you work count toward the next step.
What you need to start
A high school diploma or equivalent, then an apprenticeship sponsored by a union or contractor association, or work as a laborer or helper on a concrete crew while you learn.
How to use this page
Pick your starting point in the tool and open the first step it gives you. A free account marks each step as you finish it, so you always know your next one.
Sources
U.S. Bureau of Labor Statistics, Occupational Outlook Handbook: Masonry Workers (pay data May 2025, projections 2025–35). Checked November 28, 2026.
Frequently asked questions
How long does it take to become a concrete finisher?
Many start as laborers or helpers and learn on the job. Others complete an apprenticeship sponsored by a union or contractor association and are then considered journey workers.
How much do cement masons make?
The BLS median pay for cement masons and concrete finishers was $57,020 in May 2025. For all masonry workers the median was $58,270 a year; the lowest 10% earned under $39,670 and the highest 10% over $91,350.
Do I need a degree to become a cement mason?
No. The typical entry education is a high school diploma or equivalent.
What do concrete apprentices learn?
BLS says masonry apprentices learn blueprint reading, math, building code requirements, and safety and first aid.
Are cement mason jobs growing?
BLS projects cement mason and concrete finisher jobs to grow 2% from 2025 to 2035, from 204,800 to 208,100.
What comes after journey finisher?
With experience, masons may become supervisors, superintendents or construction managers, or start working as independent contractors.
See the whole cement mason career tree · See the brickmason career tree · See the construction laborer career tree · Start free · Explore Tsai Electro Pro
