Founding price US$69 a year · regular US$99 · See Pro
Tsai Electro

First-Line Supervisors of Construction Trades and Extraction Workers · Career line

  1. First-Line Supervisors of Construction Trades and Extraction Workers
Station 15 of 88 · First-Line Supervisors of Construction Trades and Extraction Workers route

You are here

Material takeoff (concrete, area, waste)

10 min

Learning evidence

  1. Viewed
  2. Practiced
  3. Assessment passed
  4. Practical task completed

Free: answer Create a free account to save your progress

Light it up

10-min station · view, practice, pass the check, do the task
Member toolProgress log — records each of the 4 evidence steps
Next stationReading drawings (scale, views, conflicts) →

Build a site safety coordination plan → First-Line Supervisors of Construction Trades and Extraction Workers · stations 1–88 of 88

What this skill is

(1) Convert scale to real size. (2) Convert inches to feet.

Why the job needs it

Thickness 4 in: 0.333 ft; Yards: cubic feet / 27; Waste margin: about 5-10%; 12x9 ft, 4 in: 1.33 cubic yards; 20x10 ft, 4 in: 2.47 cubic yards.

What the member lesson contains

  • 10-minute lesson
  • 2 practice tasks
    • 12 ft x 9 ft x 4 in?
    • Add waste?
  • 0-question check

Sources

★ Resources
Scroll to Top
Not a licensed Professional Engineer in Texas or any U.S. state. Does not offer engineering services. Exam-prep education only.