Brickmasons and Blockmasons · Career line
- Brickmasons and Blockmasons
You are here
Lay a lead and check course height with a story pole
Learning evidence
- Viewed
- Practiced
- Assessment passed
- Practical task completed
Free: answer Create a free account to save your progress
Needs first
✓ Lay out a masonry bond pattern on the wallLight it up
15-min station · view, practice, pass the check, do the taskCompare masonry apprenticeship offers by their records → Brickmasons and Blockmasons · stations 1–88 of 88
What this skill is
Perform the training task to lay a lead and check course height with a story pole: establish the named work area, bring the specified tools and materials to the control point, and verify the current drawing, schedule, or assigned procedure before making the first mark or placement. Copy course targets from layout CL-2…
Why the job needs it
Audit lead and course elevations through controlled benchmarks, signed calculations, cited tolerances, and authorized acceptance.
What the member lesson contains
- 15-minute lesson
- 2 practice tasks
- Changed case while learning to lay a lead and check course height with a story pole: CL-2 revision C sets course 8 at 105.337 feet.
- Observation 105.326 is found on a loose note with no lead identity.
- 5-question check
Sample question
While learning to lay a lead and check course height with a story pole, which choice best fits the assigned work and its controlling information? What is L-A's original signed difference at course 8?
- Positive 0.084 inch
- Negative 0.084 inch
- Negative 0.096 inch
- Positive 0.180 inch