Structural Iron and Steel Workers · Career line
- Structural Iron and Steel Workers
You are here
Set connector fall-protection controls before connecting
15 min
Learning evidence
- Viewed
- Practiced
- Assessment passed
- Practical task completed
Needs first
✓ Check column anchorage before erection proceedsLight it up
15-min station · view, practice, pass the check, do the taskMember toolProgress log — records each of the 4 evidence steps
Match steel piece marks to the erection drawing → Structural Iron and Steel Workers · 88 skill stations
… 28 more stations
Set connector fall-protection controls before connectingHere
… 50 more stations
Structural Iron and Steel WorkersJob
What this skill is
Begin the pretask brief with the exact bay, elevation, member sequence, connector names, lower levels, and rescue route. Measure or confirm the exposure height rather than estimating from floor count.
Why the job needs it
Match connector duty, height, anchorage, clearance, access, and rescue before the member enters the bay.
What the member lesson contains
- 15-minute lesson
- 2 practice tasks
- A connector at 24 feet finds the planned anchorage blocked.
- Check a 34-foot connection with 13 feet available clearance and 9 feet required.
- 5-question check
Sample question
At a 34-foot connector position, when should the worker connect to the approved system?
- Before entering the exposed connection position
- After the beam has swung past twice
- Only when a supervisor takes a photograph
- After removing the harness leg straps
