Bus and Truck Mechanics and Diesel Engine Specialists · Career line
- Bus and Truck Mechanics and Diesel Engine Specialists
You are here
Test a 12- or 24-volt truck starting and charging complaint
Learning evidence
- Viewed
- Practiced
- Assessment passed
- Practical task completed
Free: answer Create a free account to save your progress
Light it up
15-min station · view, practice, pass the check, do the taskTurn a driver complaint into a testable work order → Bus and Truck Mechanics and Diesel Engine Specialists · stations 1–66 of 66
What this skill is
Obtain the wiring diagram and label every battery, series jumper, parallel branch, disconnect, starter feed, ground path, and charging connection. Confirm nominal system voltage with the key off and compare individual battery state of charge after the specified rest or surface-charge removal.
Why the job needs it
Identify the battery architecture, prove battery condition, and use loaded cranking and charging measurements to isolate faults.
What the member lesson contains
- 15-minute lesson
- 2 practice tasks
- Changed case: two batteries are connected positive-to-positive and negative-to-negative, and a meter reads 12.6 volts across the bank.
- Design a low-crank test where bank voltage is acceptable but starter current is unusually low.
- 5-question check
Sample question
What happens to nominal voltage when two 12-volt batteries are connected in parallel?
- It remains 12 volts while current capacity is shared
- It becomes 24 volts at every branch
- It falls to 6 volts under no load
- It alternates between 12 and 24 volts
Sources
https://www.ase.com/medium-heavy-truck-certification-tests · 2026-11-26
