Maintenance and Repair Workers, General · Career line
- Maintenance and Repair Workers, General
You are here
Complete a preventive maintenance route with measurable findings
15 min
Learning evidence
- Viewed
- Practiced
- Assessment passed
- Practical task completed
Light it up
15-min station · view, practice, pass the check, do the taskMember toolProgress log — records each of the 4 evidence steps
Triage a building maintenance request before touching the asset → Maintenance and Repair Workers, General · 69 skill stations
… 33 more stations
Complete a preventive maintenance route with measurable findingsHere
… 26 more stations
Maintenance and Repair Workers, GeneralJob
What this skill is
Review the current route revision, asset list, due window, task-specific hazards, required instruments, and outstanding corrective work before starting. Verify instrument condition and calibration status where applicable.
Why the job needs it
Execute a PM route with asset identity, comparable measurements, explicit defers, and reconciled exceptions.
What the member lesson contains
- 15-minute lesson
- 2 practice tasks
- Changed case: an asset tag on the route does not match the label on the machine at that location.
- A pressure reading is above alert but below the shutdown threshold.
- 5-question check
Sample question
What makes a PM finding reproducible?
- A checkmark beside the asset
- A copied prior reading
- The technician's memory
- A value with unit, point, state, time, and applicable limit