Build an open or closed valley from the approved detail

15 min

Learning evidence

  1. Viewed
  2. Practiced
  3. Assessment passed
  4. Practical task completed

Free: answer Create a free account to save your progress

Light it up

15-min station · view, practice, pass the check, do the task
Member toolProgress log — records each of the 4 evidence steps
Next stationInstall step and counterflashing at a wall or chimney →

Set up a roofing assignment from the roof plan → Roofers · stations 1–88 of 88

What this skill is

Transfer the valley centerline from ridge intersection to eave and verify that the deck has no hump, gap, or unsupported joint that distorts the trough. Install the specified valley membrane centered and shingle-lapped from the low end upward.

Why the job needs it

Center, lap, cut, and fasten the approved valley system so concentrated runoff has a clear protected path.

What the member lesson contains

  • 15-minute lesson
  • 2 practice tasks
    • Changed case: the installed reveal measures only two inches at mid-valley although the control calls for five inches there.
    • Lay out a closed-cut valley before cutting the upper plane.
  • 5-question check

Sample question

Why are valley metal sections installed from the low end upward?

  • Lower pieces are always a different metal gauge
  • The head of the valley carries no water
  • Starting low eliminates all measuring
  • Upper pieces must overlap lower pieces in the runoff direction

https://codes.iccsafe.org/content/IRC2024P1/chapter-9-roof-assemblies · 2026-11-26