How to become a roofer
Roofers · 88-step route
This is a free, ordered route from day one to job-ready work as a roofer in the US. Each step is one skill with a short lesson, the daily work it shows up in, and a check. Take the steps in order: later steps build on earlier ones.
The 88 steps
- Set up a roofing assignment from the roof plan
- Chemical labels and Safety Data Sheets (HazCom)
- Fall protection trigger heights and systems
- Ladders (setup and use)
- Lockout/tagout (controlling hazardous energy)
- Heat illness (prevention, acclimatization, emergency)
- Injuries: first aid and reporting to OSHA
- Silica dust and other dust
- Electrical basics for every trade
- Noise and hearing protection
- Safe lifting and body strain (ergonomics)
- Emergency action plan, fire extinguishers and evacuation
- Fatigue, long shifts and night work
- Shop math: units, fractions and conversions
- Material takeoff (concrete, area, waste)
- Reading drawings (scale, views, conflicts)
- Work orders and shift handoffs
- Change orders and talking with customers
- Pricing, invoicing and cash flow
- Pay, overtime and pay stubs
- Raising a problem with your supervisor (and the next level)
- Writing an incident or near-miss report
- Hours, breaks, attendance and calling out
- Mark roof zones, slopes, and drainage paths
- Use the assigned low-slope roof fall-protection plan
- Set and use the assigned ladder for roof access
- Hoist and stage roofing materials without overloading the roof
- Run a roofing heat-illness work cycle
- Make a roof-surface go or stop decision as weather changes
- Check a roof deck and substrate before covering it
- Measure roof area, slope, laps, and waste for a takeoff
- Lay underlayment courses to the approved roof detail
- Install the eave and rake edge sequence
- Build an open or closed valley from the approved detail
- Install step and counterflashing at a wall or chimney
- Set asphalt-shingle starter and course layout
- Install asphalt shingles to the approved fastening pattern
- Finish hips, ridges, and the specified roof vent path
- Place built-up roofing plies in the specified sequence
- Lay a modified-bitumen sheet without trapping a defect
- Lay out a single-ply membrane field
- Weld and probe a TPO seam to the approved settings
- Prime and close an EPDM seam
- Flash a single-ply roof penetration
- Lay out metal roof panels from an eave control line
- Close metal roof seams and fasteners to the system detail
- Finish roof drains and scuppers for positive drainage
- Trace a roof leak before opening the repair area
- Run the assigned torch-roofing hot-work controls
- Coordinate a hot-asphalt kettle and roof delivery
- Complete a roofing quality walk by drainage path
- Hand off a dry roof with repair and warranty records
- Choosing a path into a trade (registered apprenticeship, school, on-the-job)
- Paying for training and checking a course before you pay
- Resume, application and interview for a first job in a new occupation
- First-day hiring paperwork (Form I-9, W-4)
- Your pay rights (minimum wage, overtime, records)
- Your safety rights (PPE payment, reporting, retaliation, refusing danger)
- The first week and first 90 days on a crew
- Turning prior work into transferable skills (O*NET mapping)
- Building proof (evidence portfolio)
- Credit for prior experience and a transition plan
- Moving to another state with a trade license
- Harassment, discrimination and retaliation (EEOC)
- Family and medical leave (FMLA)
- Health coverage when you start or lose a job (benefits, COBRA, Special Enrollment)
- Unemployment insurance after a job loss
- Getting hurt at work - workers' comp claims and protection from retaliation
- Reading a job offer (pay, overtime status, schedule, benefits)
- The license ladder (apprentice, journeyman, master, contractor)
- Becoming a lead - competent person and safety duties
- Coaching apprentices and assigning work within scope
- Keeping a license - continuing education and renewal
- Licenses to start - trade license vs authority to contract
- Structure and setup (sole proprietor, LLC, EIN, bank account)
- Taxes for the self-employed (Schedule C, SE tax, estimated tax)
- Insurance and bonds
- Pricing a job - markup vs margin
- Estimates, contracts, change orders and the Cooling-Off Rule
- Invoicing, cash flow, records and job software
- Hiring your first worker (classification, forms, new-hire report, workers' comp)
- Funding a small trade business (SBA loans)
- Checklist: Entering a trade with little money (ordered plan)
- Checklist: Career change with prior experience (ordered plan)
- Checklist: Moving up: journeyman to master, new crew lead
- Checklist: Starting your own trade business (ordered setup)
- Checklist: Someone is hurt on the job (ordered response)
- Checklist: Finding, getting and keeping a state license (any occupation)
