Roofers · Career line

  1. Roofers
On the way to Roofers · station 43 of 89

You are here

Prime and close an EPDM seam

15 min

Learning evidence

  1. Viewed
  2. Practiced
  3. Assessment passed
  4. Practical task completed

Create a free account to save your progress

Light it up

15-min station · view, practice, pass the check, do the task
Member toolProgress log — records each of the 4 evidence steps
Next stationFlash a single-ply roof penetration →

Set up a roofing assignment from the roof plan → Roofers · 88 skill stations

What this skill is

Position the two EPDM sheets with the required overlap and allow them to relax. Fold back the upper sheet without creasing it and mark a reference line along the lower sheet.

Why the job needs it

Prepare EPDM mating faces, respect primer flash-off, place seam tape without strain, remove film under control, and roll and inspect the closure.

What the member lesson contains

  • 15-minute lesson
  • 2 practice tasks
    • Changed case: dust blows onto the primed band before tape placement.
    • Close a seam where the release film begins to lift the tape.
  • 5-question check

Sample question

Why is EPDM primer allowed to flash before seam closure?

  • To increase membrane thickness
  • To reach the specified receptive state without trapping wet solvent
  • To erase the overlap mark
  • To stretch the seam tape

Sources

★ Resources
Scroll to Top
Not a licensed Professional Engineer in Texas or any U.S. state. Does not offer engineering services. Exam-prep education only.