Roofers · Career line

  1. Roofers
On the way to Roofers · station 49 of 89

You are here

Run the assigned torch-roofing hot-work controls

15 min

Learning evidence

  1. Viewed
  2. Practiced
  3. Assessment passed
  4. Practical task completed

Create a free account to save your progress

Light it up

15-min station · view, practice, pass the check, do the task
Member toolProgress log — records each of the 4 evidence steps
Next stationCoordinate a hot-asphalt kettle and roof delivery →

Set up a roofing assignment from the roof plan → Roofers · 88 skill stations

What this skill is

Review the permit with the applicator and fire watch at the actual roof zone. Walk both sides of walls or decks where heat may transmit, remove movable combustibles, shield approved immovable exposures, and identify voids that require a non-torch detail.

Why the job needs it

Torch roofing begins only inside an active permit with cleared combustibles, sound fuel equipment, a dedicated fire watch, controlled application, and complete post-work monitoring.

What the member lesson contains

  • 15-minute lesson
  • 2 practice tasks
    • Changed case: the approved torch run reaches an open deck joint hidden beneath the roll.
    • Set up a torch hose where the shortest route crosses the roof-access landing.
  • 5-question check

Sample question

What is the fire watch's primary role during torch roofing?

  • Carry rolls whenever the applicator pauses
  • Observe continuously for ignition and act under the permit plan
  • Choose membrane colors for the owner
  • Increase flame size at cold laps

Sources

★ Resources
Scroll to Top
Not a licensed Professional Engineer in Texas or any U.S. state. Does not offer engineering services. Exam-prep education only.