Structural Iron and Steel Workers · Career line

  1. Structural Iron and Steel Workers
On the way to Structural Iron and Steel Workers · station 29 of 89

You are here

Set a beam and complete its initial connection

15 min

Learning evidence

  1. Viewed
  2. Practiced
  3. Assessment passed
  4. Practical task completed

Create a free account to save your progress

Light it up

15-min station · view, practice, pass the check, do the task
Member toolProgress log — records each of the 4 evidence steps
Next stationInstall and verify temporary steel-frame bracing →

Match steel piece marks to the erection drawing → Structural Iron and Steel Workers · 88 skill stations

What this skill is

Before hoisting, place the specified bolts, washers, nuts, and tools in secured containers. Confirm the near and far ends of the beam from stable grid references.

Why the job needs it

Connect both beam ends without body exposure, forcing, or early crane release.

What the member lesson contains

  • 15-minute lesson
  • 2 practice tasks
    • Three of four required initial bolts are complete and the last hole is offset.
    • Both ends have the required bolts; rehearse the controlled crane-load reduction.
  • 5-question check

Sample question

B-88 has three of four required initial bolts. What is its release status?

  • Released by majority count
  • HOLD until the complete initial condition is met
  • Released if the west end looks tight
  • Approved after removing the fourth bolt

Sources

★ Resources
Scroll to Top
Not a licensed Professional Engineer in Texas or any U.S. state. Does not offer engineering services. Exam-prep education only.