Structural Iron and Steel Workers · Career line
- Structural Iron and Steel Workers
You are here
Set a beam and complete its initial connection
15 min
Learning evidence
- Viewed
- Practiced
- Assessment passed
- Practical task completed
Needs first
✓ Land, orient, and initially secure a steel columnLight it up
15-min station · view, practice, pass the check, do the taskMember toolProgress log — records each of the 4 evidence steps
Match steel piece marks to the erection drawing → Structural Iron and Steel Workers · 88 skill stations
… 25 more stations
Set a beam and complete its initial connectionHere
… 53 more stations
Structural Iron and Steel WorkersJob
What this skill is
Before hoisting, place the specified bolts, washers, nuts, and tools in secured containers. Confirm the near and far ends of the beam from stable grid references.
Why the job needs it
Connect both beam ends without body exposure, forcing, or early crane release.
What the member lesson contains
- 15-minute lesson
- 2 practice tasks
- Three of four required initial bolts are complete and the last hole is offset.
- Both ends have the required bolts; rehearse the controlled crane-load reduction.
- 5-question check
Sample question
B-88 has three of four required initial bolts. What is its release status?
- Released by majority count
- HOLD until the complete initial condition is met
- Released if the west end looks tight
- Approved after removing the fourth bolt
