Commercial plan review: voltage and schedule consistency

Check whether voltage information agrees across commercial plan documents.

What you’ll do

  • Your attempt
  • Try a changed case
  • Evidence to prepare

First step

In commercial plan review, compare the voltage stated on the one-line with the voltage in the panel schedule before calculating anything. If they differ, compute two conditional balanced three-phase currents from the same VA value: divide VA by the square root of three times each candidate voltage. Label each result conditional on its source. Common misconception: the sheet that looks newer must carry the right voltage. Correct practice: without a named revision authority, neither voltage wins; report both currents, flag the conflict, and request the authority's decision. Transfer: in a changed fictional paper case, the panel schedule carries a different voltage label from the one-line and neither sheet shows a revision record; repeat the method.

  • Your attempt Members only
  • Try a changed case Members only
  • Evidence to prepare Members only

Members only

See membership

Practice for this step: 3 questions

Choose one answer per question. This practice runs in your browser.

Using the 2026 optional calculation for a one-family dwelling, the general loads total 36,000 VA. The first 8,000 VA of the general loads is taken at 100% and the remainder at 40%. The air-conditioning load of 6,000 VA is then added at 100%. What is the calculated load in amperes on a 120/240-volt, single-phase service?
A conference center (not a dwelling) has 6 single-gang boxes, each with one duplex receptacle on one yoke; 3 two-gang boxes, each with two duplex receptacles on two separate yokes; and 1 single receptacle on its own yoke. Each single or multiple receptacle on one yoke is counted at 180 VA. What receptacle load is calculated?
A 208Y/120-volt, three-phase building has a 400-ampere service. A year of recorded demand data shows a maximum demand of 220 amperes. A 50 kVA, three-phase load will be added. For an existing building the existing load is taken as 125% of the measured maximum demand, and the new load is added at 100%. What is the calculated load in amperes?