Short answer: In the 2026 NEC, load calculations moved from Article 220 to Article 120. A non-dwelling (commercial) load calculation adds up separate pieces, each with its own rule. General lighting is the floor area times the unit load for the occupancy, such as 1.3 VA per square foot for an office or 1.9 VA per square foot for a retail store (NEC Table 120.42(A)). General-use receptacles count 180 VA per yoke (NEC 120.14(I)), and where the non-dwelling receptacle demand table applies, the first 10 kVA is taken at 100 percent and the rest at 50 percent (NEC Table 120.47). Show windows add 200 VA per linear foot (NEC 120.46(A)). Three or more pieces of commercial kitchen equipment get their own demand factor, 65 percent for six or more units, but never less than the two largest loads (NEC 120.56).
PSI lists Services, Service Equipment and Separately Derived Systems (6 scored NEC Knowledge and 4 scored Calculations questions, with load calculations named in the Calculations part) and Feeders (3 and 3) as subject areas of the Texas Journeyman exam. PSI does not say how many questions are commercial load calculations. The Texas Journeyman Practice Pack has 1,000 original questions and 10 timed mock exams in the real two-part format, with step-by-step solutions for every calculation. Try free practice questions without signing up. Get the full pack for US$39 with one payment.
Tsai Electro is an independent learning site. Not affiliated with TDLR, PSI or NFPA. We explain the ideas in our own words and do not reproduce NEC text. Check every rule and table value in your own 2026 NEC, and follow your supervisor and the local inspector.
How this differs from a dwelling calculation
The dwelling method (general lighting by floor area, small appliance and laundry circuits, the optional method) is on service and feeder load calculations for the Texas Journeyman exam. A commercial building has no small appliance circuits and no dwelling demand table for lighting. Instead, each kind of load has its own line:
| Load | How it is counted | Where to look |
|---|---|---|
| General lighting | Area × unit load for the occupancy | Table 120.42(A) |
| General-use receptacles | 180 VA per yoke; 90 VA per receptacle on one piece of equipment with four or more | 120.14(I) |
| Receptacle demand | First 10 kVA at 100 percent, remainder at 50 percent | Table 120.47 |
| Show window lighting | 200 VA per linear foot of window | 120.46(A) |
| Sign outlet | At least 1,200 VA | 120.14(F) |
| Commercial kitchen equipment | Demand factor by number of units, not less than the two largest | 120.56 and Table 120.56 |
| Heating and air conditioning | Use only the larger of two loads that will not run at the same time | 120.6 |
The pieces one by one
- General lighting. Use the outside dimensions of the building and the unit load for its occupancy (NEC Table 120.42(A)). An office is 1.3 VA per square foot and a retail store 1.9 VA per square foot.
- Receptacles. Each single or multiple receptacle on one yoke counts 180 VA. A single piece of equipment made of four or more receptacles counts at least 90 VA per receptacle (NEC 120.14(I)).
- Receptacle demand. Where the non-dwelling receptacle demand table applies, add up the receptacle load, then take the first 10,000 VA at 100 percent and everything above that at 50 percent (NEC Table 120.47). Banks and office buildings have their own receptacle rule with a 1 VA per square foot allowance; read its conditions in the section before you combine it with the demand factor (NEC 120.43).
- Show windows. 200 VA for each linear foot of show window, measured horizontally along its base (NEC 120.46(A)). Track lighting has its own rule in the next subsection (NEC 120.46(B)).
- Sign outlet. At least 1,200 VA for each required sign outlet (NEC 120.14(F)). Where a sign circuit is required is covered with sign circuits on NEC 600, 620 and 670.
- Kitchen equipment. For three or more qualifying units of commercial cooking, dishwasher, water heating and similar kitchen equipment, apply the demand factor for the number of units, after confirming which equipment the table covers: 70 percent for five units and 65 percent for six or more. The result is never less than the sum of the two largest kitchen loads. Space heating, ventilation and air conditioning equipment are not counted in this group (NEC 120.56).
- Noncoincident loads. Where two loads will not run at the same time, such as electric heat and air conditioning, use only the larger one (NEC 120.6).
Exam questions often state that the lighting is a continuous load. In that case, the general conductor sizing rule uses 125 percent of the continuous part plus 100 percent of the rest, subject to the equipment rating provisions and exceptions (NEC 215.4(A)(1)). Keep the calculated load and the conductor sizing step separate, so you do not apply 125 percent twice.
Worked example: small retail store
A retail store is 8,000 square feet. It has 60 general-use duplex receptacles, 30 linear feet of show window, one sign outlet and a 10 kW electric heater that never runs with the 6 kW air conditioner. Find the calculated load in VA using the stated loads and demand factors. Do not apply the 125 percent continuous load multiplier in this step.
- Lighting. 8,000 × 1.9 = 15,200 VA.
- Receptacles. 60 × 180 = 10,800 VA. First 10,000 at 100 percent = 10,000. The remaining 800 at 50 percent = 400. Receptacle load = 10,400 VA.
- Show window. 30 × 200 = 6,000 VA.
- Sign. 1,200 VA.
- Heat or air conditioning. The larger is the heater, 10,000 VA. The air conditioner is left out.
- Total. 15,200 + 10,400 + 6,000 + 1,200 + 10,000 = 42,800 VA.
At 208Y/120 V three-phase, 42,800 ÷ (208 × 1.732) = 42,800 ÷ 360.3 = about 118.8 A before any 125 percent continuous-load step.
Worked example: kitchen equipment demand
A restaurant kitchen has six pieces of equipment that qualify for the commercial kitchen demand table: 12 kW, 10 kW, 6 kW, 5 kW, 3 kW and 2 kW.
- Connected load. 12 + 10 + 6 + 5 + 3 + 2 = 38 kW.
- Demand factor for six units. 38 × 0.65 = 24.7 kW.
- Two largest check. 12 + 10 = 22 kW. 24.7 kW is larger, so the kitchen demand load is 24.7 kW.
If the two largest units had been 15 kW and 12 kW, their sum (27 kW) would be the floor, and you would use it instead of a smaller demand result.
Check yourself
- What is the general lighting load for a 5,000 square foot office? 5,000 × 1.3 = 6,500 VA.
- A building has 80 general-use receptacles. What is the receptacle load after the demand factor? 80 × 180 = 14,400 VA. 10,000 + (4,400 × 0.5) = 12,200 VA.
- Four kitchen units total 20 kW. Which table applies? Table 120.56, for the number of units, but never less than the two largest units.
Disclosure: If you buy through the Amazon link below, Tsai Electro may earn a commission at no extra cost to you. As an Amazon Associate I earn from qualifying purchases.
Find Article 120 fast on exam day
NFPA 70, National Electrical Code, 2026 Edition (softcover). Article 120 is new in the 2026 edition, so older notes and books that say 220 point to the wrong place. Find Table 120.42(A), Table 120.47 and Table 120.56 before exam day and highlight them or add notes. The Texas exam is open book. PSI allows a soft-bound NEC with highlighting, underlining and notes made in advance. Loose-leaf, spiral-bound and ring-bound copies are not allowed, and only permanent index tabs made or supplied by the NEC publisher are permitted; homemade and third-party tabs are not.
FAQ
Where did the commercial load calculation rules go in the 2026 NEC?
They moved from Article 220 to Article 120, along with the dwelling calculations.
How much is each receptacle in a commercial load calculation?
180 VA for each single or multiple receptacle on one yoke, with 90 VA per receptacle for one piece of equipment with four or more receptacles.
What demand factor applies to commercial receptacles?
The first 10 kVA at 100 percent and the remainder over 10 kVA at 50 percent.
How is show window lighting calculated?
200 VA per linear foot of show window, measured horizontally along its base.
Can the kitchen demand result be less than the two largest units?
No. The kitchen demand load is never less than the sum of the two largest kitchen equipment loads.
Sources checked October 2026
- PSI Candidate Information Bulletin, Texas electrician examinations (updated September 15, 2026): https://test-takers.psiexams.com/api/content/bulletin/1682
- NFPA 70, National Electrical Code, 2026 Edition, Articles 120 and 215