See pages from the actual download
These are excerpts of existing downloadable material. The source page is labelled below each image. Click an image to enlarge it. The full download is unchanged.
Preview images show the supplied material, not a customer result or an official approval. Any filled example is fictional as labelled in the original.
Self-directed Texas Master exam-preparation practice: work through original questions, compare the calculation steps and build your own code-book review routine.
The Calculations part is where Texas Master candidates get stuck
Prepare Knowledge and Calculations as separate study tasks. Use the 368-question bank, timed two-part mocks and worked calculation solutions to identify the first step to revisit, then return for another practice attempt.
Built for the Texas Master exam and nothing else
- The PSI two-part format. Part 1, NEC Knowledge: 75 questions in 150 minutes. Part 2, Calculations: 33 questions in 170 minutes. You need 70% on each part (49 of the 70 scored questions in NEC Knowledge, 21 of the 30 in Calculations), and time left in one part does not carry over to the next.
- Weighted like the real exam. Every mock follows the scored items per topic area in the Texas PSI content outline. In Calculations, services and service equipment carry 8 of the 30 scored points and motors and generators carry 6, so the mocks give them the same weight.
- The 2026 NEC. Texas exams follow the 2026 NEC from September 1, 2026. Load calculations moved from Article 220 to the new Article 120, and the questions and lookup paths use the 2026 locations.
- Step-by-step calculations. Services, feeders, motors, transformers, conductors, raceway fill, EV chargers, RV parks and marinas: every calculation question shows the rule, the numbers given, every step, the rounding where it matters, and why each wrong option is wrong.
What you get
- 10 full two-part timed mocks (Mock A–J). Each form has 75 NEC Knowledge questions and 33 Calculations questions. The ten forms draw from the 368-question bank, so repeated attempts let you revisit the same topics in different timed forms.
- A score card after every mock. Your score for each part against the 70% pass line, your score for each official topic area, and one line that names any part that scored below 70% on this mock.
- Step-by-step solutions for all 110 calculation questions.
- 368 practice questions across all 20 PSI topic areas, by topic or as a full mock, with the answer after each one.
- Code-book navigation data for 321 questions. Use these locators as starting points for your own open-book review. For other questions, work from the explanation and your own 2026 NEC. Read Informational Notes as context and confirm the applicable section or table.
- Find-these-first list. The 60 code-book locations referenced most often by questions in this pack, ranked by frequency (Article 250, Article 430 and Article 120 first). PSI allows only permanent index tabs made or supplied by the NEC publisher; homemade tabs are not allowed in the exam room.
- Unlimited retakes of practice rounds and mocks, a wrong-answer list and a weak-area check.
Price
US$79, one payment, no subscription and no auto-renewal.
US$79 brings the question bank, timed mock forms, worked calculation solutions, printable study materials and the included offline review companion together in one purchase. Keep the downloaded files for repeated study.
Want to see the questions first? Try 20 Texas Master questions free, no sign-up needed.
Build a focused review routine
- Start with original practice questions for the Texas Master two-part format and work through the calculation explanations.
- Keep your 2026 NEC beside you. Use the available references and lookup aids to find the applicable rule, then compare it with your own reasoning.
- Use the dated practice-page corrections log when revisiting a question.
- Spot an error? Report it right from the question.
What makes a useful Master calculation error log?
A useful log names the wrong decision, not just the wrong answer. Use columns for the topic, reference, first incorrect step and the check you will apply next time. The Texas Master practice pack provides worked calculation solutions that you can compare with your own work.
Source: Product contents
A study routine to try
- Keep the original attempt and date.
- Mark the first point where your solution differs.
- Write a short correction and revisit the topic in a later session.
Sources
Review the current product and access terms
How can I judge which Master topics need more practice?
Use your own attempts to identify weak topics rather than treating another person's difficulty rating as a study plan. Try a mock, group the misses by topic and inspect the explanations. The Texas Master pack describes topic results and worked calculations for that review.
Source: Product contents
A study routine to try
- Group your misses by topic and by reason.
- Choose the topic you can least clearly explain.
- Repeat the review after another attempt and compare the error types.
Sources
Review the current product and access terms
FAQ
What if the arithmetic was right?
Check whether you selected the intended rule and used the correct given values.
Does the pack include worked explanations?
Its product page describes step-by-step calculation solutions and explanations of incorrect choices.
Does a difficult practice question mean I am not ready?
One question is a reason to inspect a topic. Make your plan from several attempts and your ability to explain the work.
Should I ignore topics I answered correctly?
Review any answer you guessed, even when it was marked correct.
Find your weak topics, then rehearse both Master exam portions
This addition to the US$79 Texas Master practice pack includes a 40-question diagnostic PDF, an automatically scored diagnostic spreadsheet, two timed practice sets with separate answer booklets, and a one-page outline map. The price stays US$79.
- Complete the diagnostic and enter your answers in the spreadsheet.
- Use the topic scores and weak-topic ranks to choose the matching review blocks in the diagnostic PDF.
- Work through those blocks and the existing practice pack with your 2026 NEC.
- Keep the two mocks unseen until you are ready for a timed rehearsal.
Each mock contains 70 scored NEC Knowledge questions for 150 minutes and 30 scored Calculations questions for 170 minutes. Score the portions separately: 49/70 and 21/30 correspond to 70%. Unused time does not transfer between portions. The actual PSI exam has 75 Knowledge items including 5 unscored, and 33 Calculations items including 3 unscored. The mocks contain the scored items only.
Official format reference: PSI Bulletin 1682, printed pages 9-11, updated September 15, 2026. Use the bulletin for current test instructions and these original practice questions for your own review. Official format source: PSI Bulletin 1682, printed pages 9-11, updated September 15, 2026
Add a topic diagnostic, targeted review blocks and two timed scored-item rehearsals to your study routine. For a separate theory, NEC and exam-preparation library, explore: Mike Holt’s Master library
See the member path beyond the practice files
Use the pack for Texas Master exam practice and your free account to explore the wider staged skill path and available progress tools. Paid member access follows current plans. Create a free account to see the member path. Create a free account to see the member path
Optional further reading: Ray Holder, 2026 Master Electrician’s Exam Prep Guide, ISBN 9798880800100, on Amazon (affiliate link). This ISBN search targets that one book; check the title and edition before buying.
Texas Master practice: review the calculation before another mock
A mock score tells you what to revisit. The worked solution lets you check the step that went wrong.
The Texas Master Practice Pack includes 368 practice questions and 10 full two-part timed mocks built from that bank.
What you can use
| Study step | Included material |
|---|---|
| Practice bank | 368 questions across 20 PSI topic areas. |
| Calculation review | Worked solutions for all 110 calculation questions. |
| Mock review | A score card after each mock shows results by part and topic. |
A study routine to try
Choose a missed calculation, write out your attempt and compare it with the worked solution. Repeat it without the key before starting another mock.
US$79, one payment.
Practice with feedback on your computer
An additional offline companion is now included at the same US$79 price. Six Master calculation-review decisions and a first-error reconstruction workspace for rule, inputs, units, arithmetic and later retry. Use the review workspace alongside the included question explanations and your own code-book references.
- 6 items with explanations and a wrong, unsure or needs-review queue. Your selections or numeric answers receive immediate feedback.
- Keep your own correction notes and export a private session file. Import that file later to resume this product’s practice.
- A topic-specific planning or record-check tool includes a separate fictional example. Its limits are stated beside the inputs.
Download texas-master-electrician-exam-prep-offline-companion.zip, extract the ZIP and open START-HERE.html in a current desktop browser. Work offline after downloading. Export your private session before closing or reloading to keep your answers, then import the backup when you return. Keep and transfer the exported file yourself when moving between devices.
Use the included PDF, templates and sample pages alongside the companion. Review the explanations, keep a note of the first uncertain step and return to it on another attempt. For planning figures, use your own inputs and confirm actual requirements with the responsible employer, program or authority.
TEXAS CAREER PROJECT · 03 / 04 · ENGLISH + ESPAÑOL
Master plan-review coordination project
Bring the skills together in one original project: eight linked tasks, worked reasoning, a changed case and four review criteria. The downloadable ZIP includes the complete project in English and Spanish, TXT study records, editable JSON save-and-restore and blank CSV worksheets.
Included with this product at its current price. Extract the ZIP and open START.html. Work offline without installing an app. Keep your existing study materials and add a project you can return to with your own saved record.
Try the first project task
Fictional desk-review packet MX. A has 4.5 kVA connected, B 8.0 kVA with supplied exercise demand factor 0.65, C 3.0 kVA full. Independent balanced model transformer 30 kVA at 480 V line-to-line; √3=1.732. Motor paper model output 7.5 hp,746 W/hp,efficiency 0.90,PF 0.85,three-phase 480 V. Review chain: document check 1 h→calculation review 2 h→responsible approval 0.5 h; quantity review 1.5 h can start after document check. Two reviewers each have 3 h; one reviewer covers document+calculations+approval. An applicant has 11,800 verified training hours and 18 months holding an ordinary Journeyman Electrician license. No design, permit or license approval is implied.
Separate connected load from the supplied demand model.
Compare the worked reasoning
Connected 4.5+8+3=15.5 kVA. Supplied demand 4.5+(8×0.65)+3=12.7 kVA.0.65 applies only toB and is not a cited NEC factor.
Proyecto completo en español: Proyecto Master de revisión y coordinación
Ocho tareas conectadas, guías resueltas, caso cambiado y cuatro criterios de revisión. El ZIP incluye este proyecto completo en inglés y español, registro TXT, guardado y restauración JSON editable y hojas CSV vacías. Incluido en este producto al precio actual.
Paquete ficticio MX de revisión documental. A 4.5 kVA conectados, B 8.0 kVA con factor de ejercicio 0.65, C 3.0 kVA completos. Modelo trifásico equilibrado independiente: transformador 30 kVA a 480 V entre líneas; √3=1.732. Motor de papel: 7.5 hp,746 W/hp,eficiencia 0.90,FP 0.85,trifásico 480 V. Cadena: documento 1 h→cálculos 2 h→aprobación responsable 0.5 h; conteo 1.5 h puede empezar tras documento. Dos revisores disponen 3 h cada uno; uno cubre documento+cálculos+aprobación. Solicitante: 11,800 horas verificadas y 18 meses como Journeyman Electrician ordinario. Sin aprobación de diseño, permiso ni licencia.
Separa carga conectada y demanda del modelo.
Comparar la guía resuelta
Conectada 15.5 kVA. Demanda 4.5+(8×0.65)+3=12.7 kVA.0.65 solo paraB; no es factor NEC citado.
Use the supplied fictional packet for study; keep actual field assessment and official decisions with their responsible reviewers. / Usa el paquete ficticio para estudiar; las evaluaciones reales y decisiones oficiales corresponden a sus responsables.
Project download: texas-stage-03-integrated-project-en-es-v1.zip · English / Español
INCLUDED AT THE CURRENT PRICE · ENGLISH / ESPAÑOL
Build your next career move with skills you can show.
The new Texas Career Bridge Studio is included with this product:39 original English/Spanish practice stations,78 worked original-and-retry guides and a source-to-target planning worksheet across electrician, power-line and electrical-inspection work.
- Choose your starting work and target role, including cross-career and reverse moves.
- Practise AC power, controls, lighting, storage, equipment-label reasoning, line measurements and business decisions; use the skill-area map to find each exercise.
- Compare a worked answer, retry changed conditions and prepare evidence for a qualified review.
- Keep your private work in editable JSON or route-and-practice TXT; reopen your JSON later.
See the model. Then work the problem. Your studio includes 11 illustrated stations, with eight additional models for AC impedance, logic, resistance, lighting, markings, sources, optical loss and equipment labels. Each new figure has English and Spanish versions (16 language versions), plus editable SVG copies. Put them to work with the included 39 cases and 78 guides.
Find the first error while the problem is still fresh. Check 58 focused values and decisions across 16 original and changed model cases. Get feedback on the first number, unit or reasoning choice to revisit, add the check record to your written response, and keep it with the existing JSON or TXT export. The eight model checks work in English and Spanish, offline.
See an included diagram: AC: components and magnitude

Open START.html from texas-career-bridge-studio-en-es-v4.zip in a current browser. The studio runs offline without installation or an account. External reference and product links open only when you choose them.
Try an actual studio station: PV, storage and backup: trace every source
Learn the method
Read a multi-source drawing as an energy-boundary problem: utility, PV, battery and generator sources may have different behavior and stored-energy conditions. A status label or one open symbol does not prove isolation of every source. For the supplied energy-only model, usable AC energy=nominal battery energy (kWh)×usable fraction×conversion efficiency; duration=usable AC energy (kWh)/load (kW) only if the assumed continuous power can actually be delivered. Real interconnection, transfer, protection, emergency classification and isolation require approved design and qualified procedures.
Fictional packet
Fictional drawing lists utility, PV, battery and generator connections, but the transfer/control revision is missing. Battery 10 kWh, usable fraction 0.80, conversion efficiency 0.90; hypothetical load 2 kW and inverter continuous rating 3 kW. The owner claims one open utility symbol makes the whole system safe.
Your attempt: Calculate the limited energy model and make a source/evidence register without an operating sequence.
Compare the worked guide
Usable modeled AC energy 7.2 kWh;2 kW is below the supplied 3 kW rating, giving idealized 3.6 h under all stated assumptions. List all four potential sources and the missing controlling drawing, actual operating states, ratings/loads and authorized safety/transfer review. The arithmetic and utility symbol prove neither actual backup performance nor isolation. Do not specify disconnecting or switching actions.
The included studio adds changed-condition retries, evidence notes and the related career bridge.
Español: un siguiente paso respaldado por evidencia
Texas Career Bridge Studio, incluido al precio actual
39 estaciones originales en inglés/español,78 guías resueltas de base/reintento y hoja de planificación entre electricidad de inmuebles, líneas eléctricas e inspección.
- Elige trabajo inicial y destino, incluso cambios entre carreras o de sentido inverso.
- Practica potencia CA, control, iluminación, almacenamiento, datos de equipos, medición de líneas y decisiones empresariales; encuentra ejercicios con el mapa de áreas.
- Compara respuesta, reintenta con datos nuevos y prepara evidencia para revisión cualificada.
- Guarda JSON editable o TXT de ruta/práctica y restaura tu archivo después.
Visualiza el modelo y resuelve el caso. El estudio incluye 11 estaciones ilustradas, con ocho modelos gráficos adicionales para impedancia CA, lógica, resistencia, iluminación, marcado, fuentes, pérdidas ópticas y datos de equipos. Las ocho nuevas figuras tienen versiones en inglés y español (16 versiones) y copias SVG editables. Aprende con los 39 casos y 78 guías incluidos.
Detecta el primer error mientras el problema sigue fresco. Verifica 58 valores y decisiones clave en 16 casos de modelos originales y modificados. Recibe una indicación del primer número, unidad u opción de razonamiento que revisar, añade el registro a tu respuesta escrita y consérvalo con la exportación JSON o TXT existente. Las verificaciones de los ocho modelos funcionan en inglés y español, sin conexión.
Mira una figura incluida: CA: componentes y módulo

Abre START.html de texas-career-bridge-studio-en-es-v4.zip en navegador actual: sin instalación ni cuenta; estudio sin conexión. Enlaces externos solo se abren al elegirlos.
Prueba una estación real: FV, almacenamiento y respaldo: rastrea cada fuente
Lee dibujo multifuente como problema de límites de energía: red, FV, batería y generador tienen comportamientos/energía almacenada distintos. Etiqueta o símbolo abierto no prueba aislamiento total. Modelo solo energético: energía CA útil=kWh nominales×fracción utilizable×eficiencia; duración=kWh útiles/kW de carga solo si potencia continua puede entregarse. Interconexión, transferencia, protección, clasificación de emergencia y aislamiento reales requieren diseño aprobado/procedimientos cualificados.
Dibujo ficticio muestra red, FV, batería y generador, sin revisión de transferencia/control. Batería 10 kWh, fracción 0.80, eficiencia 0.90; carga 2 kW e inversor continuo 3 kW. Titular afirma que símbolo abierto de red hace seguro todo sistema.
Tu intento: Calcula modelo energético y registro de fuentes/evidencia sin secuencia operativa.
Compara la guía resuelta
Energía CA modelada 7.2 kWh;2 kW está bajo 3 kW dados, duración idealizada 3.6 h con supuestos. Lista cuatro fuentes y faltantes: plano vigente, estados, capacidades/cargas y revisión autorizada de seguridad/transferencia. Cálculo y símbolo no prueban respaldo ni aislamiento. No indiques desconexiones ni maniobras.
Ejercicios ficticios de preparación. Formación práctica, requisitos de licencia, experiencia aceptada y nombramiento se verifican con responsables competentes; cargo previo no concede créditos automáticamente.
Fictional preparation exercises. Pair the studio with the relevant project already included in this product. Practical training, accepted experience, credentials and work authority are verified with the responsible providers/employers/agencies; a source job title grants no automatic credit.


