Not selected · English · Dual units
My account Join free Start free test
Home Article

Conduit Bending for Apprentices: 90° Stubs, Offsets, Saddles and the Multiplier Table (Worked Examples)

Updated About 6 min read

Short answer: For an offset, multiply the offset depth by the angle’s multiplier to find the spacing between bends (2.0 at 30° or 1.4 at 45°); use the shrink allowance (1/4 inch per inch of depth at 30°) to adjust your layout mark based on the location you are measuring to. For a 90° stub, subtract the bender’s take-up from the stub height.

Not in an apprenticeship yet? If you are applying to a program that uses an aptitude test, practicing the math before your interview can help you prepare. The Texas Electrical Apprenticeship Entry Kit has 1,300 math and 216 reading practice questions with worked answers, 6 timed aptitude simulations and 20 interview answers. Launch price US$49 through November 30, 2026, one payment.

Tsai Electro is an independent learning site. Not affiliated with any tool brand, TDLR or PSI. Field multipliers and take-up values below come from Klein Tools’ published bender guide; the exact values are our own trigonometry. Your bender’s markings and your foreman’s method come first.

The multiplier and shrink table

Bend angleField multiplierExact (1 ÷ sin)Field shrink per inch of depthExact shrink per inch
10°6.05.7591/16 in (0.063)0.087
22.5°2.62.6133/16 in (0.188)0.199
30°2.02.0001/4 in (0.250)0.268
45°1.41.4143/8 in (0.375)0.414
60°1.21.1551/2 in (0.500)0.577

Field values: Klein Tools Conduit Bender Guide. Exact values: multiplier = 1 ÷ sin(angle); shrink per inch = tan(angle ÷ 2).

Why it works. In an offset, the conduit between the two bends is the long side of a right triangle, and the offset depth is the short side opposite the bend angle. So the distance between bends = depth ÷ sin(angle). Shrink is the reduction in the conduit’s straight-line run caused by an offset or saddle: depth × (1 ÷ sin − 1 ÷ tan), which simplifies to depth × tan(angle ÷ 2). At 30°: 2.000 − 1.732 = 0.268.

The field numbers are rounded for speed. At 30° the multiplier is exact, and the field shrink is a little low: on a 4-inch offset, 1.00 inch versus 1.07 inches.

Worked example 1: a 30° offset

You need to clear a 4-inch-deep obstruction that starts 30 inches from the end of a stick of 1/2-inch EMT. You choose 30° bends.

  1. Distance between marks: 4 × 2.0 = 8 inches.
  2. Shrink: 4 × 1/4 = 1 inch.
  3. First mark: for this simplified layout, assume the 30-inch dimension is measured from the conduit end to the target location of the first bend. Add the 1-inch field shrink allowance to obtain a 31-inch reference mark. Actual bend placement depends on the obstruction geometry, the direction of the offset, and the reference marks on your bender. Check these before bending.
  4. Second mark: 8 inches back toward the end, at 31 − 8 = 23 inches.
  5. Make two opposing 30° bends in the same plane so the conduit leaves the offset parallel to its original direction. Follow the bender manufacturer’s instructions for hook orientation and reference-mark alignment.

Geometry check: an ideal 8-inch segment at 30° has a horizontal projection of 8 × cos 30° = 6.93 inches and a rise of 8 × sin 30° = 4.00 inches, the depth you wanted. These calculations verify the offset geometry, but they do not replace checking the actual bend locations, take-up and clearance against the obstruction.

Tolerance check: the skill target for this node is mark placement within 2% of the calculated spacing. On 8 inches, 2% is 0.16 inch, a little over 1/8 inch (0.125 inch) and under 3/16 inch (0.188 inch).

Worked example 2: a 90° stub

You need a 10-inch stub-up on 1/2-inch EMT.

  1. Take-up for 1/2-inch EMT on the Klein guide’s table: 5 inches. The same table lists 6 inches for 3/4-inch EMT and 8 inches for 1-inch EMT.
  2. Mark: 10 − 5 = 5 inches from the end.
  3. Line the bender’s arrow up with the mark, hook toward the free end, and bend to 90°, checking with a level.

Take-up differs between bender brands and sizes. Read the number stamped on your bender head before you trust any table.

Worked example 3: a 3-point saddle

For a layout exercise, assume the required saddle rise is 3 inches and the center of the obstruction is 36 inches from the end. You use a 45° center bend and two 22.5° return bends. In the field, determine the required rise from the actual obstruction dimensions and clearance before marking the conduit.

  1. Klein’s saddle table for a 45° center: add 3/16 inch of shrink per inch of obstruction height, and place the outer marks 2-1/2 inches from center per inch of height.
  2. Shrink: 3 × 3/16 = 9/16 inch.
  3. Center mark: 36 + 9/16 = 36-9/16 inches.
  4. Distance to outer marks: 3 × 2-1/2 = 7-1/2 inches.
  5. Outer marks: 36-9/16 − 7-1/2 = 29-1/16 inches, and 36-9/16 + 7-1/2 = 44-1/16 inches.
  6. Bend 45° at the center mark using the center-of-bend notch, then 22.5° at each outer mark.

Check in decimals: 36.5625 − 7.5 = 29.0625 and 36.5625 + 7.5 = 44.0625. Both match.

The 360° rule

The 2023 NEC limits an EMT run to 360° of total bends between pull points under Section 358.26. This is the established rule used in the exercise below. Before relying on it for a 2026 NEC installation or exam, check the applicable provision in your 2026 NEC and any local amendments.

Example: a run with one 30° offset (30 + 30 = 60°), two 90° bends (180°) and one 3-point saddle (45 + 22.5 + 22.5 = 90°).

  1. Total: 60 + 180 + 90 = 330°.
  2. The 330° total is within the 360° bend limit. However, this calculation alone does not establish that the run meets every applicable installation requirement or that a pull point would not be useful for pulling conductors.
  3. Add one more 45° offset (90°) and the total becomes 420°, so you need a pull point.

Bending habits that save conduit

  • Use the bender that matches the conduit size and type.
  • Some springback is normal. Overbend slightly so the conduit rests at the angle you want.
  • For a two-bend offset or three-point saddle intended to stay in one plane, keep the bends aligned to avoid an unintended dogleg. Other conduit layouts may require bends in different planes.
  • Use foot pressure on the heel and the handle as a guide, as the Klein guide describes.
  • Ream and deburr every cut before you pull wire.

Check yourself

Our own practice questions. Answers below each.

  1. A 5-inch offset at 45°: what spacing and shrink? Answer: Using Klein’s field values, 5 × 1.4 = 7 inches between marks, and 5 × 3/8 = 1-7/8 inches of shrink. These are field estimates; the ideal geometric values are approximately 7.07 inches of spacing and 2.07 inches of shrink.
  2. A 3-inch offset at 22.5°: what spacing and shrink? Answer: 3 × 2.6 = 7.8 inches; shrink 3 × 3/16 = 9/16 inch.
  3. A 12-inch stub on 3/4-inch EMT with a 6-inch take-up: where is the mark? Answer: 12 − 6 = 6 inches from the end.
  4. Under the 360° EMT bend rule described above, is this layout within the limit? Two 90s, two 45° offsets and one 30° offset between pull points. Answer: 180° + 180° + 60° = 420°, which exceeds the assumed 360° limit. A compliant redesign would need an additional pull point or fewer bends. Confirm the applicable requirement in the 2026 NEC and any local amendments.

FAQ

What is the multiplier for a 30-degree offset?

2.0. Multiply the offset depth by 2 to get the distance between the two bends. Shrink at 30° is about 1/4 inch per inch of offset depth.

What is shrink in conduit bending?

Shrink is the reduction in the conduit’s straight-line run caused by an offset or saddle. It is used as a layout allowance when placing bend marks. The correct adjustment depends on your measurement reference, bend geometry, and bender instructions.

How do you calculate a 90-degree stub?

Subtract the bender’s take-up from the stub height you want, mark that distance from the end, line up the arrow and bend to 90°. On Klein’s table, 1/2-inch EMT takes up 5 inches.

How many bends are allowed in a conduit run?

For this practice exercise, use the 360° total-bend limit identified in the 2023 NEC for EMT. The 2026 NEC and local amendments govern actual installations. Add a pull point, such as a pull box or conduit body, when a run needs more.

Next step: if you are still trying to get in, start with the test. The Texas Electrical Apprenticeship Entry Kit covers the three ways into a Texas apprenticeship, 13 Texas programs checked on their own websites, 1,300 math practice questions and 6 timed simulations. US$49 launch price through November 30, 2026.

Next skill: grounding and bonding. Metal conduit is also a grounding path. Learn the 5 NEC 250 grounding and bonding mistakes apprentices make.

Sources checked October 2026

★ Resources
Scroll to Top
Not a licensed Professional Engineer in Texas or any U.S. state. Does not offer engineering services. Exam-prep education only.