Concrete finisher skills checklist: all 90 steps, in order
- 90 free lessons
- About 27.5 hours in total
- 8 stages
- Progress saved
Start step 1: Read a concrete delivery ticket before placement
Every skill a concrete finisher needs in the US, as one ordered checklist: from the first safety check to getting hired and moving up. Each step is a short lesson with the daily work it shows up in and a quick check. Take them in order, because later steps build on earlier ones.
Looking for pay, training and licensing? Read How to become a concrete finisher.
The 90 steps
Stage 1: Start here · 1 step · about 30 min
- Read a concrete delivery ticket before placement30 min
Match each concrete delivery to the placement order and keep proposed adjustments distinct from recorded events.
Stage 2: Safety on every job · 12 steps · about 120 min
- Chemical labels and Safety Data Sheets (HazCom)10 min
- Fall protection trigger heights and systems10 min
- Ladders (setup and use)10 min
- Lockout/tagout (controlling hazardous energy)10 min
- Heat illness (prevention, acclimatization, emergency)10 min
- Injuries: first aid and reporting to OSHA10 min
- Silica dust and other dust10 min
- Electrical basics for every trade10 min
- Noise and hearing protection10 min
- Safe lifting and body strain (ergonomics)10 min
- Emergency action plan, fire extinguishers and evacuation10 min
- Fatigue, long shifts and night work10 min
Stage 3: How the work day runs · 10 steps · about 100 min
- Shop math: units, fractions and conversions10 min
- Material takeoff (concrete, area, waste)10 min
- Reading drawings (scale, views, conflicts)10 min
- Work orders and shift handoffs10 min
- Change orders and talking with customers10 min
- Pricing, invoicing and cash flow10 min
- Pay, overtime and pay stubs10 min
- Raising a problem with your supervisor (and the next level)10 min
- Writing an incident or near-miss report10 min
- Hours, breaks, attendance and calling out10 min
Stage 4: Core concrete finisher skills · 31 steps · about 1050 min
- Coordinate a slump test without altering the sample30 min
Protect representative slump testing and keep every result tied to its load, time, condition, and decision owner.
- Protect field-made concrete test specimens30 min
Protect specimen identity, initial curing, and custody without taking over the testing technician's work.
- Keep wet concrete off skin and out of boots25 min
Prevent cement contact and act promptly when fresh concrete gets inside protective clothing.
- Check forms and subgrade before the truck arrives30 min
Verify stable forms, supported subgrade, protected embeds, grade controls, and working access before concrete is released.
- Place concrete close to final position30 min
Match controlled deposits near final position to the crew's capacity and stop before segregation, form movement, or continuity loss.
- Strike off flatwork to the grade controls30 min
Keep the screed on verified controls with a manageable roll, coordinated strokes, immediate fills, and measured recovery from any moved reference.
- Bull-float the slab without trapping bleed water30 min
Use a clean, nearly flat bull float in overlapping lanes, and stop before free water or excessive tooling damages the slab surface.
- Form a durable slab edge with an edger30 min
Time the edging pass, keep the tool supported and flat, consolidate perimeter voids, and blend the specified border without trapping water or moving the form.
- Tool contraction joints at the planned locations30 min
Transfer the approved joint layout, tool a continuous specified groove, and protect its alignment and arrises through every later finish pass.
- Float the surface when the concrete can support the pass30 min
Judge floating readiness locally, use a clean low magnesium float in organized overlaps, and never replace lost timing with water, dry cement, or excessive pressure.
- Build a hard-troweled finish in successive passes35 min
Create a hard-troweled finish with clean crossed passes, gradually increasing pitch and pressure only as the slab supports them, and stop at the specified result.
- Pull a consistent broom texture across exterior flatwork30 min
Broom a properly floated, ready surface in one steady direction with clean bristles, uniform overlap, protected borders, and no added surface water.
- Start curing as soon as the finish allows30 min
Stage the approved curing system, apply it promptly and uniformly after finishing, protect every edge and seam, and maintain it for the documented project duration.
- Sequence a hot-weather placement to limit rapid surface drying35 min
Match hot-weather deliveries and panel size to actual crew and curing capacity, stage drying controls before discharge, and never use added surface water to recover lost timing.
- Protect fresh concrete during cold weather35 min
Place only on acceptable unfrozen support, monitor representative temperatures, protect every boundary promptly, and remove cold-weather controls only through the documented plan.
- Respond to plastic-shrinkage warning signs before finishing30 min
Recognize local crusting and fine cracks over plastic concrete, stop damaging work, activate the approved drying controls, and preserve evidence without adding water.
- Finish a ramp while holding slope and cross-slope controls35 min
Hold ramp geometry with protected controls, small placement sections, and repeated center-and-edge measurements while preserving transitions and specified texture.
- Place and finish a formed vertical repair40 min
Prepare sound boundaries, brace a sealed form, place measured repair material in verifiable increments, and protect the restored profile through curing.
- Keep integral-color concrete visually consistent35 min
Verify integral-color loads, repeat the placement and finishing sequence, cure uniformly, and compare protected panels only under meaningful conditions.
- Stamp a decorative pattern without double impressions40 min
Lay out a fixed baseline, register and tamp stamps to actual surface support, lift them vertically, and repair local impressions before drift or double lines spread.
- Patch small surface defects to the approved repair detail35 min
Trace a defect to sound concrete, prepare and condition a durable cavity, place compatible material within its limits, and protect joints and curing.
- Use the assigned silica control while cutting concrete35 min
Match the saw to the employer's silica-control plan, verify the complete control before contact, stop when it weakens, and collect residue without recreating dust.
- Prepare and control a walk-behind power trowel40 min
Inspect and prove the trowel controls, clear its operating envelope, match each pass to surface support, and isolate the machine before adjustment or defect work.
- Work safely around a concrete pump hose discharge zone40 min
Plan the pump-hose route, use one communicator, preserve footing and escape space, and stop flow before any loss of control or pressure concern.
- Protect work around protruding reinforcing steel35 min
Find every hazardous reinforcing projection, verify the approved protection, route work around it, and stop immediately when guarding is disturbed.
- Respect the authorization boundary for formwork removal35 min
Match form removal to exact authorization, protect the load path, follow the sequence, and stop for any difference between the plan and field condition.
- Check slab elevation and surface variation during finishing40 min
Use verified grade references and straightedges to find and correct workable highs and lows, while keeping formal tolerance acceptance within the contract method.
- Plan crew zones for a continuous slab placement40 min
Divide the slab by task and access, measure actual progress, use one rate-control channel, and rebalance the crew before any operation falls behind.
- Choose the ACI flatwork credential that matches your experience35 min
Use the current ACI policy to match examination and experience requirements to evidence, choose the honest present credential, and document every gap.
- Coordinate with ACI field testing personnel35 min
Prepare a safe test station, preserve load and location identity, protect specimens, and relay results without interfering with testing or acceptance roles.
- Build a concrete-finishing apprenticeship evidence record40 min
Map factual supervised work to the sponsor's categories, reconcile hours promptly, obtain review, preserve corrections, and use gaps to plan legitimate experience.
Stage 5: Getting hired · 11 steps · about 110 min
- Choosing a path into a trade (registered apprenticeship, school, on-the-job)10 min
- Paying for training and checking a course before you pay10 min
- Resume, application and interview for a first job in a new occupation10 min
- First-day hiring paperwork (Form I-9, W-4)10 min
- Your pay rights (minimum wage, overtime, records)10 min
- Your safety rights (PPE payment, reporting, retaliation, refusing danger)10 min
- The first week and first 90 days on a crew10 min
- Turning prior work into transferable skills (O*NET mapping)10 min
- Building proof (evidence portfolio)10 min
- Credit for prior experience and a transition plan10 min
- Moving to another state with a trade license10 min
Stage 6: Your rights at work · 6 steps · about 60 min
- Harassment, discrimination and retaliation (EEOC)10 min
- Family and medical leave (FMLA)10 min
- Health coverage when you start or lose a job (benefits, COBRA, Special Enrollment)10 min
- Unemployment insurance after a job loss10 min
- Getting hurt at work - workers' comp claims and protection from retaliation10 min
- Reading a job offer (pay, overtime status, schedule, benefits)10 min
Stage 7: Moving up and running your own work · 13 steps · about 130 min
- The license ladder (apprentice, journeyman, master, contractor)10 min
- Becoming a lead - competent person and safety duties10 min
- Coaching apprentices and assigning work within scope10 min
- Keeping a license - continuing education and renewal10 min
- Licenses to start - trade license vs authority to contract10 min
- Structure and setup (sole proprietor, LLC, EIN, bank account)10 min
- Taxes for the self-employed (Schedule C, SE tax, estimated tax)10 min
- Insurance and bonds10 min
- Pricing a job - markup vs margin10 min
- Estimates, contracts, change orders and the Cooling-Off Rule10 min
- Invoicing, cash flow, records and job software10 min
- Hiring your first worker (classification, forms, new-hire report, workers' comp)10 min
- Funding a small trade business (SBA loans)10 min
Stage 8: Plan your next move · 6 steps · about 60 min
- Checklist: Entering a trade with little money (ordered plan)10 min
- Checklist: Career change with prior experience (ordered plan)10 min
- Checklist: Moving up: journeyman to master, new crew lead10 min
- Checklist: Starting your own trade business (ordered setup)10 min
- Checklist: Someone is hurt on the job (ordered response)10 min
- Checklist: Finding, getting and keeping a state license (any occupation)10 min
Questions
How long does the concrete finisher checklist take?
About 27.5 hours of lessons in total: 90 steps of 10 to 40 minutes each. You can stop at any step and pick up later.
Is it free?
Yes. Every lesson is free with a free account, and the steps you practice are saved. Pro adds graded checks and extra tools.
Do I have to take the steps in order?
It works best that way. The checklist runs: Start here, then Safety on every job, then How the work day runs, then Core concrete finisher skills, then Getting hired, then Your rights at work, then Moving up and running your own work, then Plan your next move. Later lessons assume you know the earlier ones.
How do I get hired or licensed as a concrete finisher?
This checklist covers the skills. For pay, training programs and licensing, read How to become a concrete finisher.
