Roofers · Career line
- Roofers
You are here
Hoist and stage roofing materials without overloading the roof
15 min
Learning evidence
- Viewed
- Practiced
- Assessment passed
- Practical task completed
Needs first
✓ Set and use the assigned ladder for roof accessLight it up
15-min station · view, practice, pass the check, do the taskMember toolProgress log — records each of the 4 evidence steps
Set up a roofing assignment from the roof plan → Roofers · 88 skill stations
… 23 more stations
Hoist and stage roofing materials without overloading the roofHere
… 55 more stations
RoofersJob
What this skill is
Count the packages at ground level and compare their labels with the approved submittal and hoist plan. Calculate the load for each lift, including pallet, rigging, and attachments when the lift plan requires them.
Why the job needs it
Calculate, land, distribute, protect, and count roofing materials without creating structural, fall, drainage, or wind hazards.
What the member lesson contains
- 15-minute lesson
- 2 practice tasks
- Changed case: two membrane rolls arrive without readable weight labels, although identical-looking rolls were 310 pounds yesterday.
- Plan staging for shingle bundles, ridge vent cartons, and flashing coils on a small steep roof.
- 5-question check
Sample question
What is the calculated weight of four 310-pound rolls on a 90-pound pallet before listed rigging?
- 1,150 pounds
- 1,240 pounds
- 1,330 pounds
- 1,420 pounds
