Founding price US$69 a year · regular US$99 · See Pro
Tsai Electro

Roofers · Career line

  1. Roofers
Station 30 of 88 · Roofers route

You are here

Check a roof deck and substrate before covering it

15 min

Learning evidence

  1. Viewed
  2. Practiced
  3. Assessment passed
  4. Practical task completed

Free: answer Create a free account to save your progress

Light it up

15-min station · view, practice, pass the check, do the task
Member toolProgress log — records each of the 4 evidence steps
Next stationMeasure roof area, slope, laps, and waste for a takeoff →

Set up a roofing assignment from the roof plan → Roofers · stations 1–88 of 88

What this skill is

Begin with the assembly and substrate requirements, then mark the exact inspection zone on the roof plan. Verify the deck type and the release or inspection record named by the project.

Why the job needs it

Inspect and map roof substrate readiness so only identified, clean, compatible, accepted areas are covered.

What the member lesson contains

  • 15-minute lesson
  • 2 practice tasks
    • Changed case: after Zone W-2 is released, a leaking hose wets an eight-foot strip before insulation starts.
    • Check a concrete deck zone containing curing residue, one roof drain, and three newly patched penetrations.
  • 5-question check

Sample question

What is the roofer's role when a visibly bent deck edge is found at P-7?

  • Bridge it immediately with spare cover board
  • Document and hold the location for authorized repair and release
  • Change the insulation pattern to hide the edge
  • Declare the entire building structurally unsafe

Sources

https://codes.iccsafe.org/content/IBC2024P1/chapter-15-roof-assemblies-and-rooftop-structures · 2026-11-26

★ Resources
Scroll to Top
Not a licensed Professional Engineer in Texas or any U.S. state. Does not offer engineering services. Exam-prep education only.